Price list updated at
06.03.2026
Good afternoon our potential customer. By following these instructions, you will be able to make a preliminary estimate within 3-5 minutes and understand how much your future repair or construction will cost.
To do this you need:
1. Click the "Calculate yourself" button.
2. Select the required service in the required section.
3. Write the quantity + click the “Add to estimate” button.
4. After all selected services, scroll down to the “Your estimate” section. Check if everything is correct or if you need to add or remove something (to remove it, there is a “Delete” button).
5. Then fill in all the information about yourself and the object + click the “Upload estimate” button. A preliminary estimate in PDF format will be downloaded to your PC (or smartphone), which is convenient to read, check whether all work is indicated and print (if necessary).
If, based on the preliminary estimate, you understand that the prices suit you, then call the indicated numbers and we will arrange a meeting with you at your facility.
Calculate yourself
Technical Specification1. Bark beetle/Lamb (6)
| Name of work | Cost | Quantity | Total |
| 1.1. Surface primer | 50 ₴ | м2/м.п. | |
| 1.2. Insulation of walls with mineral wool or polystyrene foam | 495 ₴ | м2/м.п. | |
| 1.3. Aligning walls with reinforcing glue on a grid | 135 ₴ | м2/м.п. | |
| 1.4. Quartz primer | 60 ₴ | м2/м.п. | |
| 1.5. Applying lambskin plaster | 355 ₴ | м2/м.п. | |
| 1.6. Installing the visor | 1 095 ₴ | м2/м.п. |
2. Thermal panels (4)
| Name of work | Cost | Quantity | Total |
| 2.1. Surface primer | 700 ₴ | м2/м.п. | |
| 2.2. Insulation of walls with mineral wool or polystyrene foam | 200 ₴ | м2/м.п. | |
| 2.3. Aligning walls with reinforcing glue on a grid | 700 ₴ | м.п. | |
| 2.4. Applying glue (if the surface is being painted) | 900 ₴ | м2/м.п. |
3. Siding (6)
| Name of work | Cost | Quantity | Total |
| 3.1. Installation of mineral wool insulation | 495 ₴ | м2/м.п. | |
| 3.2. Installation of windproof film | 55 ₴ | м2/м.п. | |
| 3.3. Frame installation | 275 ₴ | м2/м.п. | |
| 3.4. Arrangement of slopes/adjacencies | 280 ₴ | м.п. | |
| 3.5. Siding decoration | 425 ₴ | м2/м.п. | |
| 3.6. Comprehensive work | 1 250 ₴ | м2/м.п. |
4. Clinker brick (6)
| Name of work | Cost | Quantity | Total |
| 4.1. Installation of mineral wool insulation | 495 ₴ | м2/м.п. | |
| 4.2. Installation of windproof film | 55 ₴ | м2/м.п. | |
| 4.3. Frame installation | 425 ₴ | м2/м.п. | |
| 4.4. Arrangement of slopes/adjacencies | 280 ₴ | м.п. | |
| 4.5. Finishing with clinker facade tiles | 855 ₴ | м2/м.п. | |
| 4.6. Comprehensive work | 1 830 ₴ | м2/м.п. |
5. Block/house-euroboard (6)
| Name of work | Cost | Quantity | Total |
| 5.1. Installation of mineral wool insulation | 495 ₴ | м2/м.п. | |
| 5.2. Installation of windproof film | 55 ₴ | м2/м.п. | |
| 5.3. Frame installation | 425 ₴ | м2/м.п. | |
| 5.4. Arrangement of slopes/adjacencies | 280 ₴ | м.п. | |
| 5.5. Tidying up block house/evrodoshka | 440 ₴ | м2/м.п. | |
| 5.6. Comprehensive work | 1 415 ₴ | м2/м.п. |
6. Profiled sheeting (6)
| Name of work | Cost | Quantity | Total |
| 6.1. Installation of mineral wool insulation | 495 ₴ | м2/м.п. | |
| 6.2. Installation of windproof film | 55 ₴ | м2/м.п. | |
| 6.3. Frame installation | 275 ₴ | м2/м.п. | |
| 6.4. Arrangement of slopes/adjacencies | 280 ₴ | м.п. | |
| 6.5. Finishing with corrugated board | 450 ₴ | м2/м.п. | |
| 6.6. Comprehensive work | 1 275 ₴ | м2/м.п. |
7. HBF (SCANROC) (6)
| Name of work | Cost | Quantity | Total |
| 7.1. Installation of mineral wool insulation | 215 ₴ | м2/м.п. | |
| 7.2. Installation of windproof film | 55 ₴ | м2/м.п. | |
| 7.3. Frame installation | 425 ₴ | м2/м.п. | |
| 7.4. Arrangement of slopes/adjacencies | 280 ₴ | м.п. | |
| 7.5. Installation of NBF panels | 600 ₴ | м2/м.п. | |
| 7.6. Comprehensive work | 1 295 ₴ | м2/м.п. |
8. Marble chips (mosaic plaster) (6)
| Name of work | Cost | Quantity | Total |
| 8.1. Installation of mineral wool insulation | 45 ₴ | м2/м.п. | |
| 8.2. Installation of windproof film | 525 ₴ | м2/м.п. | |
| 8.3. Leveling with adhesive and reinforcing mixture with mesh reinforcement | 135 ₴ | м2/м.п. | |
| 8.4. Priming with quartz primer | 60 ₴ | м.п. | |
| 8.5. Marble crumb decoration | 400 ₴ | м2/м.п. | |
| 8.6. Comprehensive work | 1 105 ₴ | м2/м.п. |
9. Thermally modified wood (6)
| Name of work | Cost | Quantity | Total |
| 9.1. Installation of mineral wool insulation | 215 ₴ | м2/м.п. | |
| 9.2. Installation of windproof film | 55 ₴ | м2/м.п. | |
| 9.3. Frame installation | 425 ₴ | м2/м.п. | |
| 9.4. Arrangement of slopes/adjacencies | 280 ₴ | м.п. | |
| 9.5. Installation of thermal wood | 425 ₴ | м2/м.п. | |
| 9.6. Comprehensive work | 1 120 ₴ | м2/м.п. |
10. Porcelain tiles (6)
| Name of work | Cost | Quantity | Total |
| 10.1. Installation of mineral wool insulation | 215 ₴ | м2/м.п. | |
| 10.2. Installation of windproof film | 55 ₴ | м2/м.п. | |
| 10.3. Frame installation | 425 ₴ | м2/м.п. | |
| 10.4. Arrangement of slopes/adjacencies | 280 ₴ | м.п. | |
| 10.5. Installation of porcelain stoneware | 350 ₴ | м2/м.п. | |
| 10.6. Comprehensive work | 1 045 ₴ | м2/м.п. |
11. Fiber cement panels (6)
| Name of work | Cost | Quantity | Total |
| 11.1. Installation of mineral wool insulation | 215 ₴ | м2/м.п. | |
| 11.2. Installation of windproof film | 55 ₴ | м2/м.п. | |
| 11.3. Frame installation | 425 ₴ | м2/м.п. | |
| 11.4. Arrangement of slopes/adjacencies | 280 ₴ | м.п. | |
| 11.5. Installation of fiber cement boards | 510 ₴ | м2/м.п. | |
| 11.6. Comprehensive work | 1 205 ₴ | м2/м.п. |
12. Composite panels (6)
| Name of work | Cost | Quantity | Total |
| 12.1. Installation of mineral wool insulation | 215 ₴ | м2/м.п. | |
| 12.2. Installation of windproof film | 55 ₴ | м2/м.п. | |
| 12.3. Frame installation | 425 ₴ | м2/м.п. | |
| 12.4. Arrangement of slopes/adjacencies | 280 ₴ | м.п. | |
| 12.5. Installation of composite panels | 285 ₴ | м2/м.п. | |
| 12.6. Comprehensive work | 980 ₴ | м2/м.п. |
13. HPL panels (6)
| Name of work | Cost | Quantity | Total |
| 13.1. Installation of mineral wool insulation | 215 ₴ | м2/м.п. | |
| 13.2. Installation of windproof film | 55 ₴ | м2/м.п. | |
| 13.3. Frame installation | 425 ₴ | м2/м.п. | |
| 13.4. Arrangement of slopes/adjacencies | 280 ₴ | м.п. | |
| 13.5. Installation of HPL panels | 225 ₴ | м2/м.п. | |
| 13.6. Comprehensive work | 920 ₴ | м2/м.п. |
14. Polyurethane foam (3)
| Name of work | Cost | Quantity | Total |
| 14.1. Frame installation | 425 ₴ | м2/м.п. | |
| 14.2. Installation of PPU coating | 7 485 ₴ | м3 | |
| 14.3. Comprehensive work (with a PPU thickness of 100mm) | 1 175 ₴ | м2/м.п. |
15. Brick (4)
| Name of work | Cost | Quantity | Total |
| 15.1. Surface priming | 45 ₴ | м2/м.п. | |
| 15.2. Insulation of walls with mineral wool or foam plastic | 215 ₴ | м2/м.п. | |
| 15.3. Laying the facade with facing bricks with anchor installation and jointing | 1 775 ₴ | м2/м.п. | |
| 15.4. Comprehensive work | 2 035 ₴ | м2/м.п. |
16. Sandwich panels (3)
| Name of work | Cost | Quantity | Total |
| 16.1. Frame installation | 425 ₴ | м2/м.п. | |
| 16.2. Installation of sandwich panels | 525 ₴ | м2/м.п. | |
| 16.3. Comprehensive work | 950 ₴ | м2/м.п. |
17. Natural and artificial facing stone (6)
| Name of work | Cost | Quantity | Total |
| 17.1. Surface primer | 45 ₴ | м2/м.п. | |
| 17.2. Insulation of walls with mineral wool or polystyrene foam | 525 ₴ | м2/м.п. | |
| 17.3. Aligning walls with reinforcing glue on a grid | 135 ₴ | м2/м.п. | |
| 17.4. Quartz primer | 60 ₴ | м2/м.п. | |
| 17.5. Applying lambskin plaster | 845 ₴ | м2/м.п. | |
| 17.6. Installing the visor | 1 610 ₴ | м2/м.п. |
18. Travertine (8)
| Name of work | Cost | Quantity | Total |
| 18.1. Surface primer | 45 ₴ | м2/м.п. | |
| 18.2. Insulation of walls with mineral wool or polystyrene foam | 525 ₴ | м2/м.п. | |
| 18.3. Aligning walls with reinforcing glue on a grid | 135 ₴ | м2/м.п. | |
| 18.4. Quartz primer | 60 ₴ | м2/м.п. | |
| 18.5. Applying lambskin plaster | 845 ₴ | м2/м.п. | |
| 18.6. Facade polishing | 1 135 ₴ | м2/м.п. | |
| 18.7. Dust removal and application of protective coating | 175 ₴ | м2/м.п. | |
| 18.8. Installing the visor | 2 920 ₴ | м2/м.п. |
19. Flexible brick (5)
| Name of work | Cost | Quantity | Total |
| 19.1. Surface primer | 45 ₴ | м2/м.п. | |
| 19.2. Insulation of walls with mineral wool or polystyrene foam | 525 ₴ | м2/м.п. | |
| 19.3. Installation of flexible bricks with reinforcing mesh on adhesive mixture | 135 ₴ | м2/м.п. | |
| 19.4. Grouting seams | 160 ₴ | м2/м.п. | |
| 19.5. Installing the visor | 865 ₴ | м2/м.п. |
20. Decorative facade elements (13)
| Name of work | Cost | Quantity | Total |
| 20.1. Surface primer | 45 ₴ | м2/м.п. | |
| 20.2. Installation of foam plastic balustrades | 975 ₴ | м.п. | |
| 20.3. Installation of keystones made of polystyrene foam | 400 ₴ | шт | |
| 20.4. Installation of foam columns | 475 ₴ | м.п. | |
| 20.5. Installation of foam brackets | 400 ₴ | шт | |
| 20.6. Installation of interfloor belts | 375 ₴ | м.п. | |
| 20.7. Installation of foam moldings | 300 ₴ | м.п. | |
| 20.8. Installation of window sills made of polystyrene foam | 475 ₴ | м.п. | |
| 20.9. Installation of foam pilasters | 475 ₴ | м.п. | |
| 20.10. Installation of foam plastic rustication (bossages) | 360 ₴ | шт | |
| 20.11. Installation of foam cornices | 375 ₴ | м.п. | |
| 20.12. Earning element joints | 175 ₴ | шт/м.п. | |
| 20.13. Painting of decorative elements | 200 ₴ | шт/м.п. |
21. Plastering with painting/painting (4)
| Name of work | Cost | Quantity | Total |
| 21.1. Surface primer | 45 ₴ | м2/м.п. | |
| 21.2. Plastering of the facade | 350 ₴ | м2/м.п. | |
| 21.3. Painting the facade | 180 ₴ | м2/м.п. | |
| 21.4. Installing the visor | 575 ₴ | м2/м.п. |
22. Granite (4)
| Name of work | Cost | Quantity | Total |
| 22.1. Surface primer | 45 ₴ | м2/м.п. | |
| 22.2. Granite installation | 1 450 ₴ | м2/м.п. | |
| 22.3. Granite polishing/grinding | 885 ₴ | м2/м.п. | |
| 22.4. Installing the visor | 2 380 ₴ | м2/м.п. |
23. Plitniak (3)
| Name of work | Cost | Quantity | Total |
| 23.1. Surface primer | 45 ₴ | м2/м.п. | |
| 23.2. Laying flagstones | 880 ₴ | м2/м.п. | |
| 23.3. Installing the visor | 925 ₴ | м2/м.п. |
24. Click-fold (6)
| Name of work | Cost | Quantity | Total |
| 24.1. Installation of mineral wool insulation | 215 ₴ | м2/м.п. | |
| 24.2. Installation of windproof film | 55 ₴ | м2/м.п. | |
| 24.3. Frame installation | 425 ₴ | м2/м.п. | |
| 24.4. Arrangement of slopes/adjacencies | 280 ₴ | м.п. | |
| 24.5. Click-fold installation | 480 ₴ | м2/м.п. | |
| 24.6. Comprehensive work | 1 175 ₴ | м2/м.п. |
25. Related works (13)
| Name of work | Cost | Quantity | Total |
| 25.1. Surface grinding | 150 ₴ | м2/м.п. | |
| 25.2. Installation of lamps, cameras, distribution boxes | 400 ₴ | шт | |
| 25.3. Installation of a metal dripper on the base | 150 ₴ | м.п. | |
| 25.4. Bypassing protruding elements on facades with thermal panels (pipes, wires, etc.) | 600 ₴ | м.п. | |
| 25.5. Installation of metal castings | 150 ₴ | м.п. | |
| 25.6. Basement waterproofing | 150 ₴ | м2/м.п. | |
| 25.7. Arrangement of overhang frames | 150 ₴ | м2/м.п. | |
| 25.8. Sheathing of overhanging soffit | 410 ₴ | м2/м.п. | |
| 25.9. Installation of a drainage system | 325 ₴ | м.п. | |
| 25.10. Alignment of walls with foam plastic/polystyrene foam | 250 ₴ | м2/м.п. | |
| 25.11. Mounting the antenna | 800 ₴ | шт | |
| 25.12. Installation of edgings from sheet metal | 250 ₴ | м.п. | |
| 25.13. Assembly/dismantling of scaffolding | 100 ₴ | м2 |
26. Dismantling works (15)
| Name of work | Cost | Quantity | Total |
| 26.1. Dismantling the plastered facade finish using mesh | 170 ₴ | м2 | |
| 26.2. Removing insulation | 210 ₴ | м2 | |
| 26.3. Dismantling the frame | 215 ₴ | м2/м.п. | |
| 26.4. Dismantling of luminaires, cameras, junction boxes with preservation | 300 ₴ | шт | |
| 26.5. Dismantling the overhang lining | 150 ₴ | м2/м.п. | |
| 26.6. Dismantling of the existing drainage system | 150 ₴ | м.п. | |
| 26.7. Dismantling the antenna with preservation | 500 ₴ | шт | |
| 26.8. Removing the windproof film | 55 ₴ | м2/м.п. | |
| 26.9. Removing the click-fold | 240 ₴ | м2/м.п. | |
| 26.10. Dismantling flagstones | 410 ₴ | м2/м.п. | |
| 26.11. Granite removal | 1 000 ₴ | м2/м.п. | |
| 26.12. Removing flexible bricks with reinforcing mesh | 75 ₴ | м2/м.п. | |
| 26.13. Dismantling the facade made of facing bricks | 850 ₴ | м2/м.п. | |
| 26.14. Dismantling of facade panels | 150 ₴ | м2/м.п. | |
| 26.15. Dismantling porcelain stoneware | 175 ₴ | м2/м.п. |
Total: 0 ₴
1. Additional expenses (10)
| Name of work | Cost | Quantity | Total |
| 1.1. Loader services (price negotiable) | 0 ₴ | ||
| 1.2. Delivery of materials (price negotiable) | 0 ₴ | ||
| 1.3. Garbage removal (price negotiable) | 0 ₴ | ||
| 1.4. Overhead costs (15% of the cost of work) https://rbk-alba.com/ua/blog/nakladnye-rasxody-cto-vklyucaet-v-sebya-eto-ponyatie | 15 ₴ | % | |
| 1.5. Designer and architect services (price negotiable) | 0 ₴ | ||
| 1.6. Lawyer services (price negotiable) | 0 ₴ | ||
| 1.7. Technical services (price negotiable) | 0 ₴ | ||
| 1.8. Rental of premises for storing construction materials and tools (price negotiable) | 0 ₴ | ||
| 1.9. Renting premises for the masters (price negotiable) | 0 ₴ | ||
| 1.10. Registration of permits (price negotiable) | 0 ₴ |
Total: 0 ₴
The cost is calculated approximately taking into account the full package of services and the volume specified by you.