Good afternoon our potential customer. By following these instructions, you will be able to make a preliminary estimate within 3-5 minutes and understand how much your future repair or construction will cost.
To do this you need:
1. Click the "Calculate yourself" button.
2. Select the required service in the required section.
3. Write the quantity + click the “Add to estimate” button.
4. After all selected services, scroll down to the “Your estimate” section. Check if everything is correct or if you need to add or remove something (to remove it, there is a “Delete” button).
5. Then fill in all the information about yourself and the object + click the “Upload estimate” button. A preliminary estimate in PDF format will be downloaded to your PC (or smartphone), which is convenient to read, check whether all work is indicated and print (if necessary).
If, based on the preliminary estimate, you understand that the prices suit you, then call the indicated numbers and we will arrange a meeting with you at your facility.

Calculate yourself

Technical Specification

1. Bark beetle/Lamb (6)

Name of work Cost Quantity Total
1.1. Surface primer 50 ₴ м2/м.п.
1.2. Insulation of walls with mineral wool or polystyrene foam 495 ₴ м2/м.п.
1.3. Aligning walls with reinforcing glue on a grid 135 ₴ м2/м.п.
1.4. Quartz primer 60 ₴ м2/м.п.
1.5. Applying lambskin plaster 355 ₴ м2/м.п.
1.6. Installing the visor 1 095 ₴ м2/м.п.

Total:

2. Thermal panels (4)

Name of work Cost Quantity Total
2.1. Surface primer 700 ₴ м2/м.п.
2.2. Insulation of walls with mineral wool or polystyrene foam 200 ₴ м2/м.п.
2.3. Aligning walls with reinforcing glue on a grid 700 ₴ м.п.
2.4. Applying glue (if the surface is being painted) 900 ₴ м2/м.п.

Total:

3. Siding (6)

Name of work Cost Quantity Total
3.1. Installation of mineral wool insulation 495 ₴ м2/м.п.
3.2. Installation of windproof film 55 ₴ м2/м.п.
3.3. Frame installation 275 ₴ м2/м.п.
3.4. Arrangement of slopes/adjacencies 280 ₴ м.п.
3.5. Siding decoration 425 ₴ м2/м.п.
3.6. Comprehensive work 1 250 ₴ м2/м.п.

Total:

4. Clinker brick (6)

Name of work Cost Quantity Total
4.1. Installation of mineral wool insulation 495 ₴ м2/м.п.
4.2. Installation of windproof film 55 ₴ м2/м.п.
4.3. Frame installation 425 ₴ м2/м.п.
4.4. Arrangement of slopes/adjacencies 280 ₴ м.п.
4.5. Finishing with clinker facade tiles 855 ₴ м2/м.п.
4.6. Comprehensive work 1 830 ₴ м2/м.п.

Total:

5. Block/house-euroboard (6)

Name of work Cost Quantity Total
5.1. Installation of mineral wool insulation 495 ₴ м2/м.п.
5.2. Installation of windproof film 55 ₴ м2/м.п.
5.3. Frame installation 425 ₴ м2/м.п.
5.4. Arrangement of slopes/adjacencies 280 ₴ м.п.
5.5. Tidying up block house/evrodoshka 440 ₴ м2/м.п.
5.6. Comprehensive work 1 415 ₴ м2/м.п.

Total:

6. Profiled sheeting (6)

Name of work Cost Quantity Total
6.1. Installation of mineral wool insulation 495 ₴ м2/м.п.
6.2. Installation of windproof film 55 ₴ м2/м.п.
6.3. Frame installation 275 ₴ м2/м.п.
6.4. Arrangement of slopes/adjacencies 280 ₴ м.п.
6.5. Finishing with corrugated board 450 ₴ м2/м.п.
6.6. Comprehensive work 1 275 ₴ м2/м.п.

Total:

7. HBF (SCANROC) (6)

Name of work Cost Quantity Total
7.1. Installation of mineral wool insulation 215 ₴ м2/м.п.
7.2. Installation of windproof film 55 ₴ м2/м.п.
7.3. Frame installation 425 ₴ м2/м.п.
7.4. Arrangement of slopes/adjacencies 280 ₴ м.п.
7.5. Installation of NBF panels 600 ₴ м2/м.п.
7.6. Comprehensive work 1 295 ₴ м2/м.п.

Total:

8. Marble chips (mosaic plaster) (6)

Name of work Cost Quantity Total
8.1. Installation of mineral wool insulation 45 ₴ м2/м.п.
8.2. Installation of windproof film 525 ₴ м2/м.п.
8.3. Leveling with adhesive and reinforcing mixture with mesh reinforcement 135 ₴ м2/м.п.
8.4. Priming with quartz primer 60 ₴ м.п.
8.5. Marble crumb decoration 400 ₴ м2/м.п.
8.6. Comprehensive work 1 105 ₴ м2/м.п.

Total:

9. Thermally modified wood (6)

Name of work Cost Quantity Total
9.1. Installation of mineral wool insulation 215 ₴ м2/м.п.
9.2. Installation of windproof film 55 ₴ м2/м.п.
9.3. Frame installation 425 ₴ м2/м.п.
9.4. Arrangement of slopes/adjacencies 280 ₴ м.п.
9.5. Installation of thermal wood 425 ₴ м2/м.п.
9.6. Comprehensive work 1 120 ₴ м2/м.п.

Total:

10. Porcelain tiles (6)

Name of work Cost Quantity Total
10.1. Installation of mineral wool insulation 215 ₴ м2/м.п.
10.2. Installation of windproof film 55 ₴ м2/м.п.
10.3. Frame installation 425 ₴ м2/м.п.
10.4. Arrangement of slopes/adjacencies 280 ₴ м.п.
10.5. Installation of porcelain stoneware 350 ₴ м2/м.п.
10.6. Comprehensive work 1 045 ₴ м2/м.п.

Total:

11. Fiber cement panels (6)

Name of work Cost Quantity Total
11.1. Installation of mineral wool insulation 215 ₴ м2/м.п.
11.2. Installation of windproof film 55 ₴ м2/м.п.
11.3. Frame installation 425 ₴ м2/м.п.
11.4. Arrangement of slopes/adjacencies 280 ₴ м.п.
11.5. Installation of fiber cement boards 510 ₴ м2/м.п.
11.6. Comprehensive work 1 205 ₴ м2/м.п.

Total:

12. Composite panels (6)

Name of work Cost Quantity Total
12.1. Installation of mineral wool insulation 215 ₴ м2/м.п.
12.2. Installation of windproof film 55 ₴ м2/м.п.
12.3. Frame installation 425 ₴ м2/м.п.
12.4. Arrangement of slopes/adjacencies 280 ₴ м.п.
12.5. Installation of composite panels 285 ₴ м2/м.п.
12.6. Comprehensive work 980 ₴ м2/м.п.

Total:

13. HPL panels (6)

Name of work Cost Quantity Total
13.1. Installation of mineral wool insulation 215 ₴ м2/м.п.
13.2. Installation of windproof film 55 ₴ м2/м.п.
13.3. Frame installation 425 ₴ м2/м.п.
13.4. Arrangement of slopes/adjacencies 280 ₴ м.п.
13.5. Installation of HPL panels 225 ₴ м2/м.п.
13.6. Comprehensive work 920 ₴ м2/м.п.

Total:

14. Polyurethane foam (3)

Name of work Cost Quantity Total
14.1. Frame installation 425 ₴ м2/м.п.
14.2. Installation of PPU coating 7 485 ₴ м3
14.3. Comprehensive work (with a PPU thickness of 100mm) 1 175 ₴ м2/м.п.

Total:

15. Brick (4)

Name of work Cost Quantity Total
15.1. Surface priming 45 ₴ м2/м.п.
15.2. Insulation of walls with mineral wool or foam plastic 215 ₴ м2/м.п.
15.3. Laying the facade with facing bricks with anchor installation and jointing 1 775 ₴ м2/м.п.
15.4. Comprehensive work 2 035 ₴ м2/м.п.

Total:

16. Sandwich panels (3)

Name of work Cost Quantity Total
16.1. Frame installation 425 ₴ м2/м.п.
16.2. Installation of sandwich panels 525 ₴ м2/м.п.
16.3. Comprehensive work 950 ₴ м2/м.п.

Total:

17. Natural and artificial facing stone (6)

Name of work Cost Quantity Total
17.1. Surface primer 45 ₴ м2/м.п.
17.2. Insulation of walls with mineral wool or polystyrene foam 525 ₴ м2/м.п.
17.3. Aligning walls with reinforcing glue on a grid 135 ₴ м2/м.п.
17.4. Quartz primer 60 ₴ м2/м.п.
17.5. Applying lambskin plaster 845 ₴ м2/м.п.
17.6. Installing the visor 1 610 ₴ м2/м.п.

Total:

18. Travertine (8)

Name of work Cost Quantity Total
18.1. Surface primer 45 ₴ м2/м.п.
18.2. Insulation of walls with mineral wool or polystyrene foam 525 ₴ м2/м.п.
18.3. Aligning walls with reinforcing glue on a grid 135 ₴ м2/м.п.
18.4. Quartz primer 60 ₴ м2/м.п.
18.5. Applying lambskin plaster 845 ₴ м2/м.п.
18.6. Facade polishing 1 135 ₴ м2/м.п.
18.7. Dust removal and application of protective coating 175 ₴ м2/м.п.
18.8. Installing the visor 2 920 ₴ м2/м.п.

Total:

19. Flexible brick (5)

Name of work Cost Quantity Total
19.1. Surface primer 45 ₴ м2/м.п.
19.2. Insulation of walls with mineral wool or polystyrene foam 525 ₴ м2/м.п.
19.3. Installation of flexible bricks with reinforcing mesh on adhesive mixture 135 ₴ м2/м.п.
19.4. Grouting seams 160 ₴ м2/м.п.
19.5. Installing the visor 865 ₴ м2/м.п.

Total:

20. Decorative facade elements (13)

Name of work Cost Quantity Total
20.1. Surface primer 45 ₴ м2/м.п.
20.2. Installation of foam plastic balustrades 975 ₴ м.п.
20.3. Installation of keystones made of polystyrene foam 400 ₴ шт
20.4. Installation of foam columns 475 ₴ м.п.
20.5. Installation of foam brackets 400 ₴ шт
20.6. Installation of interfloor belts 375 ₴ м.п.
20.7. Installation of foam moldings 300 ₴ м.п.
20.8. Installation of window sills made of polystyrene foam 475 ₴ м.п.
20.9. Installation of foam pilasters 475 ₴ м.п.
20.10. Installation of foam plastic rustication (bossages) 360 ₴ шт
20.11. Installation of foam cornices 375 ₴ м.п.
20.12. Earning element joints 175 ₴ шт/м.п.
20.13. Painting of decorative elements 200 ₴ шт/м.п.

Total:

21. Plastering with painting/painting (4)

Name of work Cost Quantity Total
21.1. Surface primer 45 ₴ м2/м.п.
21.2. Plastering of the facade 350 ₴ м2/м.п.
21.3. Painting the facade 180 ₴ м2/м.п.
21.4. Installing the visor 575 ₴ м2/м.п.

Total:

22. Granite (4)

Name of work Cost Quantity Total
22.1. Surface primer 45 ₴ м2/м.п.
22.2. Granite installation 1 450 ₴ м2/м.п.
22.3. Granite polishing/grinding 885 ₴ м2/м.п.
22.4. Installing the visor 2 380 ₴ м2/м.п.

Total:

23. Plitniak (3)

Name of work Cost Quantity Total
23.1. Surface primer 45 ₴ м2/м.п.
23.2. Laying flagstones 880 ₴ м2/м.п.
23.3. Installing the visor 925 ₴ м2/м.п.

Total:

24. Click-fold (6)

Name of work Cost Quantity Total
24.1. Installation of mineral wool insulation 215 ₴ м2/м.п.
24.2. Installation of windproof film 55 ₴ м2/м.п.
24.3. Frame installation 425 ₴ м2/м.п.
24.4. Arrangement of slopes/adjacencies 280 ₴ м.п.
24.5. Click-fold installation 480 ₴ м2/м.п.
24.6. Comprehensive work 1 175 ₴ м2/м.п.

Total:

25. Related works (13)

Name of work Cost Quantity Total
25.1. Surface grinding 150 ₴ м2/м.п.
25.2. Installation of lamps, cameras, distribution boxes 400 ₴ шт
25.3. Installation of a metal dripper on the base 150 ₴ м.п.
25.4. Bypassing protruding elements on facades with thermal panels (pipes, wires, etc.) 600 ₴ м.п.
25.5. Installation of metal castings 150 ₴ м.п.
25.6. Basement waterproofing 150 ₴ м2/м.п.
25.7. Arrangement of overhang frames 150 ₴ м2/м.п.
25.8. Sheathing of overhanging soffit 410 ₴ м2/м.п.
25.9. Installation of a drainage system 325 ₴ м.п.
25.10. Alignment of walls with foam plastic/polystyrene foam 250 ₴ м2/м.п.
25.11. Mounting the antenna 800 ₴ шт
25.12. Installation of edgings from sheet metal 250 ₴ м.п.
25.13. Assembly/dismantling of scaffolding 100 ₴ м2

Total:

26. Dismantling works (15)

Name of work Cost Quantity Total
26.1. Dismantling the plastered facade finish using mesh 170 ₴ м2
26.2. Removing insulation 210 ₴ м2
26.3. Dismantling the frame 215 ₴ м2/м.п.
26.4. Dismantling of luminaires, cameras, junction boxes with preservation 300 ₴ шт
26.5. Dismantling the overhang lining 150 ₴ м2/м.п.
26.6. Dismantling of the existing drainage system 150 ₴ м.п.
26.7. Dismantling the antenna with preservation 500 ₴ шт
26.8. Removing the windproof film 55 ₴ м2/м.п.
26.9. Removing the click-fold 240 ₴ м2/м.п.
26.10. Dismantling flagstones 410 ₴ м2/м.п.
26.11. Granite removal 1 000 ₴ м2/м.п.
26.12. Removing flexible bricks with reinforcing mesh 75 ₴ м2/м.п.
26.13. Dismantling the facade made of facing bricks 850 ₴ м2/м.п.
26.14. Dismantling of facade panels 150 ₴ м2/м.п.
26.15. Dismantling porcelain stoneware 175 ₴ м2/м.п.

Total:

Total: 0



1. Additional expenses (10)

Name of work Cost Quantity Total
1.1. Loader services (price negotiable) 0 ₴
1.2. Delivery of materials (price negotiable) 0 ₴
1.3. Garbage removal (price negotiable) 0 ₴
1.4. Overhead costs (15% of the cost of work) https://rbk-alba.com/ua/blog/nakladnye-rasxody-cto-vklyucaet-v-sebya-eto-ponyatie 15 ₴ %
1.5. Designer and architect services (price negotiable) 0 ₴
1.6. Lawyer services (price negotiable) 0 ₴
1.7. Technical services (price negotiable) 0 ₴
1.8. Rental of premises for storing construction materials and tools (price negotiable) 0 ₴
1.9. Renting premises for the masters (price negotiable) 0 ₴
1.10. Registration of permits (price negotiable) 0 ₴

Total:

Total: 0

The cost is calculated approximately taking into account the full package of services and the volume specified by you.

By clicking the button, you agree to the terms Privacy Policy

Affects the price:

  • location of the facility;
  • number and complexity of work;
  • what material and what technology to use to perform the work;
  • the amount of preparatory, loading and unloading and logistics costs;
  • completion period (compressed or uniform);
  • prices for construction materials;
  • working hours (day/night/24/7);
  • normal or short terms/work at height;
  • good weather;
  • absence of obstacles from external factors (war, strike, blocked streets, significant price increases, natural disasters);
  • the speed of the customer's decision-making;
  • coordination of work with other contractors;
  • timely acceptance and payment for completed work.